Demolition produces more waste than any other stage of a project, and the paperwork trail behind it is what gets checked when something goes wrong.
Duty of care
Under the duty of care, waste must be transferred only to an authorised person, described accurately, and documented. Using an unlicensed carrier is an offence. The Environment Agency’s public register is the place to verify anyone handling your waste. Ours is upper tier registration CBDU575260.
Segregate at source
Separating metals, timber, inert, plasterboard and mixed waste as it arises is what makes recycling possible, and it costs less than sorting later. On demolition that usually means a stockpile area per stream and discipline about what goes where.
Hazardous streams
Asbestos, contaminated soils, fluorescent tubes, refrigerant gases and lead paint all have their own routes and their own paperwork. They need identifying at survey stage, not when a machine finds them.
Transfer notes
A waste transfer note for every load, not a monthly summary. They should name the carrier, the facility, the description and the quantity. We collate ours into the close-out pack at completion, along with the RAMS, site records and daily photo log.
Recovery rates
Concrete, brick and other inert material can be crushed and reused. Metals have genuine value. Timber and plasterboard have established recycling routes. Across our jobs, up to 90% of what we remove is recycled.
What to ask a demolition contractor
Their carrier registration number, which facilities the waste goes to, whether transfer notes come per load, and what the close-out pack contains.
