...

Registered waste carrier

Environment Agency upper tier, CBDU575260. Waste transfer note every load.

Insured & accredited

£5m public liability, £10m employers’ liability. CHAS and PQS (SSIP) accredited.

Up to 90% recycled

Waste sorted at licensed facilities, so as little as possible goes to landfill.

Written fixed-price quotes

Call 07949 496 448 or send photos. Clear price before we start.

Demolition in Tilbury, RM18

We take on demolition in Tilbury from our yard in North Ockendon, a straightforward run down the A13 and A1089. That covers houses, extensions and lean-tos, garages, and commercial and industrial buildings around the port. Every job is priced as a written fixed package after a site visit.

Our work on Dock Road, Tilbury (June 2022)

In June 2022 we demolished the old guest house building on Dock Road, Tilbury. Before it was a guest house, it was the town’s old post office. It was two storeys of brick with a stone-clad ground floor, standing on the pavement edge next to a block of flats.

Former guest house on Dock Road, Tilbury, boarded up before demolition: two storeys of brick over a stone-clad ground floor

The old guest house on Dock Road, Tilbury, originally the town’s post office, before we took it down in June 2022.

Because the building fronted the pavement, the street frontage was scaffolded first, with debris netting across the full face. The pavement and road were screened while the work went on behind it, and the team worked at roof level inside the netted scaffold.

Scaffold with blue debris netting across the front of the former guest house on Dock Road, Tilbury, with an excavator working behind

The street frontage was scaffolded and netted first, so the pavement and road were screened while the building came down behind it.

Behind the frontage, the building was taken down with an excavator fitted with a sorting grab. Bricks were reclaimed and stacked on pallets as the building came down, and the rest of the brick rubble and the timber were kept in separate piles for recycling.

Excavator with a sorting grab taking down the former guest house in Tilbury, with reclaimed bricks stacked on pallets in the foreground

Reclaimed bricks stacked on pallets as the building came down.

Excavator with a sorting grab separating brick rubble and timber on the Dock Road demolition site in Tilbury

Brick rubble and timber kept in separate piles for recycling.

What demolition in Tilbury tends to involve

Tilbury is a working port town. Close to the docks, terraced streets and older buildings sit alongside industrial and logistics premises, and many buildings, like the one on Dock Road, stand right on the pavement. Domestic jobs are mostly:

  • lean-tos, rear extensions and outbuildings at the back of terraced houses, where access is often only through the house or down a narrow side passage
  • garages on shared drives.

Commercial jobs are mostly:

  • workshops, stores and welfare buildings on yards
  • older buildings being cleared for redevelopment.

Where a building fronts the street or sits next to homes, we plan the scaffold, netting and protection to neighbouring property before we price. For how a house demolition runs from start to finish, see house demolition.

Waste and paperwork

Waste leaves site on our own vehicles, with a waste transfer note for every load. Bricks, concrete, timber and metal are separated on site, and up to 90% of what we remove is recycled. We are an Environment Agency upper-tier waste carrier (CBDU575260), CHAS and PQS (SSIP) accredited, with £5m public liability and £10m employers’ liability insurance. See compliance and accreditations.

EWDS vehicles parked on Dock Road, Tilbury, beside the netted scaffold on the former guest house

Our vehicles on Dock Road during the June 2022 demolition.

Get a written fixed price

Call or WhatsApp 07949 496 448, call 01375 309 432, or email info@ewdsolutions.co.uk. Photos of the building, the access and anything attached to it help us price accurately after a site visit. We are based at Windpump Nursery, Church Lane, North Ockendon RM14 3QH, and cover London and the surrounding counties.

Related: House demolition · Demolition · Demolition in Grays · Soft strip in Tilbury · Rubbish clearance in Tilbury · Case studies

Common questions about demolition in Tilbury

Have you worked in Tilbury before?

Yes. In June 2022 we demolished the old guest house building on Dock Road, which was once the town’s post office.

How do you protect the pavement when a building fronts the street?

On Dock Road, we scaffolded the street frontage first and put debris netting across the full face before the building came down behind it. We plan the same kind of protection for any building that stands on the pavement or next to homes.

Can you take down a lean-to or extension on a terraced house?

Yes. We plan access first, often through the house or a side passage, and include temporary propping and protection to the neighbouring property where it is needed. It is priced as a written fixed package.

What happens to the bricks and the rest of the waste?

Where bricks can be reclaimed, we stack them on pallets, as on Dock Road. Everything else is separated on site and taken away on our own vehicles, with a waste transfer note for every load. Up to 90% of what we remove is recycled.

How far is Tilbury from your yard?

Our yard is at Windpump Nursery, Church Lane, North Ockendon, a straightforward run down the A13 and A1089 to Tilbury.

Call Now Button Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.